• Architecture
  • Interior Design
  • About
  • News
  • Contact
ODP Architects
  • Architecture
  • Interior Design
  • About
  • News
  • Contact

Paramount At Miami World Center Progress

This is with a great deal of excitement that construction has begun on the fourth floor — only 55 levels to go!

The 58 story building will span almost 30 acres in the heart of downtown Miami and will be comprised of 513 condos, a magnificent skydeck and lounge with a sunrise pool, a fire pit, an Infinity edge pool, an observatory and a Tai Chi Deck.

DJI_0073.JPG
DJI_0076.JPG
DJI_0081.JPG
DJI_0084.JPG
DJI_0086.JPG
DJI_0073.JPG DJI_0076.JPG DJI_0081.JPG DJI_0084.JPG DJI_0086.JPG
categories: Construction, Architecture
Tuesday 02.07.17
Posted by Brian Eickhoff
 

Paramount Miami World Center Construction Update

As we are contributing to the skyline of Miami, here are some fun facts about our construction progress:

  • 12,000 – 13,000 cubic yards of cement are being poured into the main foundation
  • 1,300 truck loads in total
  • 6 concrete pumps running simultaneously for 30 hours straight! 
20161020_122521_25.jpg
20161020_122523_25.jpg
20161020_122526_25.jpg
categories: Construction, Architecture
Tuesday 11.01.16
Posted by Brian Eickhoff
 

One Thousand Museum

“Whereas most construction is realtor or developer driven, OTM is artistically driven. The ideology of the way in which it is built is to expose the columns, rather than hide them behind a wall." Kurt Dannwolf, Principal at ODP

160908110-72.jpg
160908111-72.jpg
160908114-72.jpg
categories: Construction, Architecture
Friday 09.16.16
Posted by Brian Eickhoff
 

Paramount At Miami World Center Progress

The project began drilling pilings at the end of last year. As of today, all piles have been installed. Next, the site is geared to have the mat foundation, over 12,000 cubic yards of concrete, poured in October before the project goes vertical by year end. 

Paramount is part of the $1.7 billion Miami Worldcenter mixed-use development which is aiming toward an end-year 2018 completion date.

DJI_0028_RET_25.jpg
20160818_110716.jpg
20160818_110536.jpg
categories: Architecture, Construction
Monday 08.08.16
Posted by Brian Eickhoff
 

One Thousand Museum Progress

First GFRC permanent formwork panels in place (Level 15)

IMG_7872.JPG
IMG_7877.JPG
20160706_115733.jpg
categories: Architecture, Construction
Monday 07.11.16
Posted by Brian Eickhoff
 

One Thousand Museum Progress

Pouring the 10th floor deck

160512100-72.jpg
160512101-72.jpg
160512102-72.jpg
160512103-72.jpg
categories: Architecture, Construction
Monday 05.16.16
Posted by Brian Eickhoff
 

A striking exterior design is not the only thing One Thousand Museum by Zaha Hadid Architects will contribute to Miami →

categories: Construction, Architecture
Sunday 02.14.16
Posted by Brian Eickhoff
 

One Thousand Museum Construction Progress

Level 03 Slab_01.jpg
Level 03 Slab_03.jpg
Level 03 Slab_05.jpg
East Elevation_LookUp.jpg
NE Corner_01.jpg
SE Corner- Street Entry_01.jpg
tags: One Thousand Museum
categories: Architecture, Construction
Monday 11.09.15
Posted by Brian Eickhoff
 

AA 26000996   O'DONNELL DANNWOLF & PARTNERS ARCHITECTS INC